Road Projects for the Week of April 9 - 15
For emergency road repairs due to recent weather events, please visit the City’s Weather Events page for updates: https://connect.sammamish.us/weather-events
Upcoming Spring Construction-related Traffic Impacts
Sewer line trenching and drilling at East Sammamish Park: A private contractor will be drilling and trenching for new sewer lines at East Sammamish Park, adjacent to the Bill Reams Park Entrance. This is for a new development, Srirm Short Plat. Work will start on Monday, April 11, and is anticipated to last at least a week. Work hours are 7:00 a.m. - 3:30 p.m.. Traffic will be controlled through this area until work is completed, drivers should expect delays and use caution.
Striping Maintenance Work
The striping maintenance work was postponed due to unfavorable weather conditions. The City of Sammamish will perform the road striping maintenance work on West Beaver Lake Drive SE and East Beaver Lake Drive SE when weather conditions improve. This type of maintenance work requires dry road pavement. Fresh paint will be laid on top of the existing fog lines and center lines. The limit of work is shown in the map below.
East Lake Sammamish Trail South Segment B Stage 1 Construction
The King County East Lake Sammamish Trail (ELST) South Segment B Phase 1 continues with construction. There will be traffic impacts related to the closure of the gravel surface trail segment which causes the re-routing of cyclists and pedestrians to East Lake Sammamish Parkway (ELSP). Additionally, there will be construction traffic on ELSP.
- Project Start Point: Intersection of SE 33rd / East Lake Sammamish Shore Lane Drive SE
- Project End Point: Approximately 900' south of the intersection of SE 8th Street / East Lake Sammamish Parkway SE
Notices for construction activity outside of the City of Sammamish:
Road maintenance on 244th Ave NE near Redmond Fall City Rd, (SR-202)
This is a King County Local Services Project.
King County Road Services Division is prioritizing 244th Ave NE near SR-202 to receive snow and ice pre-treatment. Due to a slide occurring in winter 2020, both lanes of 244th Ave NE are narrowed until the impacted support wall can be repaired. The repair of the support wall is expected to begin in Summer 2023. Soil samples yielded unexpected data, which caused the design phase to be extended. King County Road Services Division has a 24/7 Road Helpline - (206) 477-8100. More information on this project can be found linked here.
Downtown Redmond Link Extension (DRLE) - Sound Transit work
This is a City of Redmond and Sound Transit project.
*This work will begin on April 15, 2022
Crews are scheduled to close the on-ramp from Redmond Way to westbound SR 520 for four months in order to build a new on-ramp. This is part of the Redmond Link Extension construction. Work is scheduled to begin on April 15, 2022. Drivers should plan accordingly due to the ramp closure. To stay up-to-date and learn more about this project, please visit the DRLE tab in Cone Zone.