Road Projects for the Week of June 5 - June 11

Road Projects for the Week of June 5 – June 11, 2021

East Lake Sammamish Trail South Segment B Stage 1 Construction

The King County East Lake Sammamish Trail (ELST) South Segment B Phase 1 will begin construction with a pre-construction meeting scheduled for June 14, 2021. Following this meeting, work will be slowly starting up in the second half of June starting with survey work and construction fencing.

There will be traffic impacts related to the closure of the gravel surface trail segment which causes the re-routing of cyclists and pedestrians to East Lake Sammamish Parkway (ELSP). Additionally, there will be construction traffic on ELSP.

  • Project Start Point: Intersection of SE 33rd / East Lake Sammamish Shore Lane Drive SE
  • Project End Point: Approximately 900' south of the intersection of SE 8th Street / East Lake Sammamish Parkway SE

Comcast Utility Work at Issaquah-Pine Lake Road and Klahanie Boulevard

Comcast will be working in the intersection of Issaquah-Pine Lake Road (IPLR) and Klahanie Blvd. on Wednesday June 9th and Thursday June 10th. Traffic control will be used for pedestrians in the area and a police officer will be in the intersection to direct traffic between the hours of 9:30 am - 3:30 pm.

228th Ave NE and NE 8th Street Asphalt Patch

Asphalt patch work will take place Monday June 7th at the intersection of 228th Ave NE and NE 8th Street. A police officer and other measures will be in place at the intersection to control traffic between the hours of 9:00 am and 3:00 pm.

Ebright Creek Fish Passage Project Construction starting in June

Utility relocation for this project started in June. The City has been coordinating with Comcast, PSE, and Ziply to relocate their facilities in advance of the culvert installation. Tentatively, the City’s contractor will mobilize beginning July 1st. Most of the work is anticipated to be complete by September 2021. During construction, drivers can expect intermittent lane closures to allow for utility relocation and site preparation. Later this summer there will be up to a 3 week closure of East Lake Sammamish Parkway at Ebright Creek to allow for installation of the box culvert. Additional notifications, message boards, and signs will be posted to detour traffic around the closure. Please visit the project page on Connect Sammamish to learn more.

228th Avenue Curb Ramp Retrofit and Catch Basin Repairs

The City of Sammamish’s contractor will continue work on 228th Avenue to retrofit curb ramps, install concrete catch basin aprons and install irrigation sleeve crossings from SE 8th St to NE 8th St. The contractor is in the process of repairing catch basins and installing concrete aprons around the frames for both the northbound and southbound lanes of traffic. This work is in preparation for the City resurfacing 228th Avenue in 2022 and benefits the City’s ADA Transition Plan goal of retrofitting all public facilities to meet the current Americans with Disabilities Act (ADA) standards. Lane closure hours through the work zone will be between 8:00 a.m. and 4:00 p.m. Monday through Friday. Traffic will be merged to one lane through the work zone and steel plates are anticipated to be on the roadway overnight.

Issaquah-Fall City Road

The closure between 247th Place SE and Klahanie Dr. SE opened on April 16, 2021. There are many people, businesses and organizations to thank and acknowledge. Take a look at the ceremonial ribbon cutting video(External link) with community acknowledgements. *Safety Reminder – Please observe the contractor’s “Sidewalk Closed” and “No Trespassing” signs at all times.

  • The Contractor will return in June to begin the excavation for the stream mitigation work.

Daytime project work hours are 7:30 a.m. - 5:00 p.m., Saturday work hours: 9:00 a.m. - 6:00 p.m.

Please visit Issaquah Fall City Road Phase 1 Construction Updates and its Three-week look-ahead on Connect Sammamish for full project updates.

Improvements at East Lake Sammamish Parkway and SE 43rd Way Roundabout

This is a City of Issaquah project. The City of Issaquah is planning summer road improvements work at East Lake Sammamish Parkway and SE 43rd Way Roundabout. The project intends to improve safety for all road users, increase visibility, and facilitate pedestrian movement at the intersection. More information will be posted as we receive it.

Downtown Redmond Link Extension (DRLE)

This is a City of Redmond project. To learn more about this project, please visit the DRLE tab in Cone Zone.

Share on Facebook Share on Twitter Share on Linkedin Email this link
<span class="translation_missing" title="translation missing: en-US.projects.blog_posts.show.load_comment_text">Load Comment Text</span>